“Although the construction firm is trying, it should please fix these extension joints so that they won’t be damaging our vehicles. Every time, one has to visit mechanic workshops to check the shock absorbers.”He said, “This bridge has to be fixed on time before the potholes get worse and start taking lives. When you enter these potholes, it will appear as if you have a deflated tyre and the bike will be shaking.
“In the case of vehicles, the steering wheel will start shaking and the vehicle will veer off if the driver is not careful.”PUNCH Metro“I have confirmed that the contractor is Julius Berger Plc and at present, they are onsite still working on the section mentioned ,” she said. Sanusi also shared with our correspondent a message from the agency’s Bridge Maintenance Unit, which read, “The road and bridge mentioned, Lagos-Ibadan dual carriage way, is under the Federal Ministry of Works and at present, the contractor is on-site, Ms Julius Berger Plc and its scope of works includes the portion mentioned.”All rights reserved.